← Blog Procurement and quotes

When to use a vulnerability scan or commission a manual review

Use risk, the size of the change and the evidence you need to decide whether to run a vulnerability scan or commission a manual review.

Swiss Cyber Security16 min readPractical readingStart reading ↓

Short answer

Use a scan when its coverage and output answer the specific question raised by a low-risk change. Ask for manual assurance when a change alters who can perform a meaningful business action or when the decision depends on context the scan cannot establish. Record the evidence the release owner needs in either case.

A vulnerability scan is enough when the decision concerns a condition the scanner can observe, the relevant assets were actually covered and the recipient accepts that evidence. Commission a manual review when you need to judge how a control behaves in a particular workflow. Combine the methods when you need both a repeatable baseline and a reasoned conclusion about a change.

Consider two release tickets. One replaces a library with a supported version in an internal utility. The other changes who can approve a credit note in a customer portal. The first can often be decided with version and scan evidence tied to the deployed build. The second needs an explanation of how permission is evaluated, who can act on whose records and what happens when a role changes. The size of the patch offers little help in choosing the evidence for either ticket.

Write the release question in terms you can verify

Start with the statement you expect to approve. A usable question includes the system, the change and the condition that must be true. For a maintenance change, the condition might be that the running service includes the approved package version and the scanner no longer reports the affected package. For a change to delegated access, the condition might be that a branch manager can approve requests for the assigned branch and that the application applies the same boundary to actions taken through the API.

Name the decision maker. A service owner clearing a maintenance ticket may accept a machine-generated result with a record of the deployed build. A customer’s assurance reviewer may require an independent report that names the functions and environments assessed. Check procurement terms or the internal release procedure before commissioning work. Independence is a requirement about who provides the evidence, and the method question is about what the evidence can establish. Set both requirements when both matter.

Put the protected activity beside the technical question. If the change fails, who loses access, who sees information they should be unable to see, or whose work stops? Ask the owner whether an existing control would limit the impact and whether you have evidence for that control. A small configuration update can change access for every customer. A larger revision to an internal report layout can have a narrower effect. Build your decision on the consequence and reach of the change.

NIST’s technical guide separates examination techniques such as documentation review, techniques for identifying possible weaknesses such as vulnerability scanning, and techniques for validating findings. The guide provides a vocabulary for specifying the work. The release rules and method choices below are a worksheet for the buyer. NIST published the guide in September 2008. The publication was checked on 20 November 2026. NIST SP 800-115, Technical Guide to Information Security Testing and Assessment

Check whether the scanner can answer the question

Start with coverage. Reconcile the expected asset list with the assets the scan actually examined. Use an identifier you can tie back to the running service, such as an image digest, a build reference or an inventory entry. Record the scan profile and when it ran. If the evidence relates to the whole release, account for unaffected components separately from components the scan failed to reach. A total number of assets offers little assurance if the one changed component is among the missing ones.

Next, check what the scanner can observe. An external scan can tell you about some conditions visible from the network location in use. An authenticated scan can collect information made available to its account, which may include installed software and configuration details. A dependency scan concerns the artefact or project files it examines. Each result needs a link to what the release owner will deploy. A source scan and an inventory of the running service may disagree when builds package different dependencies.

Treat authentication as an observation to verify. A stored credential and a completed job can coexist with a failed login on a particular asset. Check per-asset status and the level of access that the configured checks required. If the scan ran with a limited profile, capture the checks that matter to your release decision. In a staging environment, record which relevant production settings were represented and how you established that. Document meaningful gaps even if the tool reports no findings.

The Center for Internet Security’s v8.1 assessment specification distinguishes internal assets covered by a scanner from those covered by an authenticated scanner. Its measures make the denominator visible. Apply the same idea to the release by counting expected and observed assets and listing any gap by name. The specification was checked on 20 November 2026. CIS Control 7 assessment specification, safeguard 7.5

Decide how you will deal with a reported issue. Save the tool’s evidence and ask the service owner whether the reported component and configuration match the deployment. Record why a reported condition applies, why it can be dismissed or what evidence would settle the question. A supplier might ship a security fix in a package whose upstream version string stays the same. Ask for the supplier’s advisory and confirm that the deployed package belongs to the fixed build. If the release depends on that conclusion, give the verification to a named owner.

Choose a level of assurance across risk, change and evidence

Use the three decisions below as a matrix you can put into a ticket. Read all three before choosing a method. If one decision points to human judgement, specify the question a reviewer must resolve. Keep the automated checks that answer other parts of the release question.

Risk

Consider a scan-led decision when the affected function has a limited impact, the service owner understands its dependencies and the automated checks directly cover the condition in question. For example, an internal tool with established access controls may only need evidence that a maintenance release updates its dependency and leaves the existing scan baseline intact. If the same dependency supports a high-impact service, ask what the service owner needs to establish about reliability or exposure before applying the same rule.

Ask for human judgement when the impact depends on the business meaning of a permission, the sensitivity of records or the effect of a failure across organisations. Give the reviewer the actual consequence they must assess. In a portal, viewing information from a different customer and authorising a payment to a different customer are two separate consequences. A finding rated high by a tool can be outside the release question and still need immediate attention through the normal vulnerability process.

Change

Use scan evidence for a known condition that a suitable check can see. A routine version change is a candidate when the build and deployment match the check. If the change touches the source of permissions, the set of permitted actions, the separation between customers or how the service performs actions on someone’s behalf, put the affected behaviour in the review scope. Include interactions with other components if a decision made in one component is supposed to bind another.

Begin with the behaviour that changed and ask what stayed stable, using evidence such as a design diff or the release record. Property changes in configuration can be material even when application code is identical. For example, switching the system that supplies a user’s organisational unit changes the basis on which access is granted. Ask how the application handles a missing or outdated value and which part of the system owns that decision. Assign a review that follows the whole decision wherever it is made.

Evidence

Use a scan when the required claim is about what was present and observable on covered assets. Give a manual reviewer a behavioural claim to evaluate and ask them to link their conclusion to design records and agreed observations. If the recipient expects both types of evidence, request them as separate outputs. An assessor’s conclusion about one workflow cannot establish that all deployed packages were inventoried, and a package inventory cannot settle a question about account ownership in a workflow.

If a scan failed or missed an asset, distinguish a recoverable measurement gap from a method mismatch. Rerun it under approved conditions when the scan can answer the question and the missing evidence is available. Add a manual review when the underlying question requires judgement about design, behaviour or context. If the environment lacks the feature the recipient needs covered, explain the gap and decide how to obtain comparable evidence before approving the claim.

Make the manual review fit the gap

Manual review is a family of methods. Choose the one that yields useful evidence for the specific uncertainty. When the uncertainty concerns how a role should be defined, ask for a design and permission review with the people who own the workflow. When the team understands the intended policy and wants to know how the released application behaves, commission an authorised assessment of the named workflows and roles in an agreed environment. Some changes justify both.

For a design review, give the assessor the expected decisions, the actors able to make them and the relevant exceptions. Show where authority comes from and how it changes over time. Ask the assessor to document any disagreement between the business rule and the implementation design, then confirm the intended rule with the service owner. A dated design conclusion is useful before the build is available. Plan separate confirmation if the release decision depends on behaviour of a specific build.

For a workflow assessment, ask what accounts and fictional records the reviewer needs, who provides them and whether the assessment environment matches the relevant release settings. Give the assessor a definition of acceptable behaviour for each agreed role. Require enough information about coverage to tell an observed result from a review of documentation. Record any branch, role or integration the reviewer could not assess and assign the resulting decision to the release owner.

If the job goes to an outside provider, specify the expected judgement, who needs to see it and when the delivery becomes useful. State the boundary of the authorisation, any restrictions on the environment and the treatment of assessment records. Ask how the quote handles limitations and confirmation of fixes. Once you can describe the work in these terms, compare Swiss penetration test quotes using the same scope and delivery assumptions for each provider.

Reserve time for a developer or service owner to resolve uncertainties. A reviewer may need to ask why a workflow behaves differently for a certain type of account. If nobody can decide what the behaviour should be, the report can identify the question but the release may remain blocked. Name a business owner who can make that decision during the review. Keep the original question and the eventual answer in the same evidence record.

Deal with a disputed result

Separate the severity of the reported weakness from the confidence you have that it applies. Assign the service owner to confirm the asset, component and relevant setting. If the owner claims the affected component is unused, ask what evidence puts it outside the operation under review. That answer may affect the urgency of a fix while leaving the component present. Give each conclusion its own record so it can be revisited if the service starts using the component later.

Set the deadline for resolving the dispute by looking at release timing and operational exposure. If the report concerns an externally available service that already runs the affected build, send it through the normal vulnerability response process immediately. The pending release may remove the problem, and the service owner still needs to decide what to do about the running version until then. Capture which deployment each decision applies to. A ticket closed against a future build leaves open the question of when and where the fix takes effect.

Where both a scanner and an assessor report a problem, give the service owner one decision that links to both records. The scan may give the team a list of affected deployments. The assessor may explain how the condition changes the security of one feature. Closure may depend on repairing several deployments and rechecking the behaviour of the feature. Assign the evidence needed for each of those conditions to the person able to obtain it.

Handle an environment that cannot support the planned check

If a supplier operates the affected component, ask for evidence specific enough to use. A generic assurance statement may answer questions about the supplier’s process while leaving the revision or tenant configuration unknown. Ask what asset or service the evidence covers and when the supplier observed it. Record the supplier’s answer alongside the part of the change you can observe yourself. Where contracts restrict the methods you can use, give the release owner a clear choice between narrower evidence and a revised release plan.

If the intended internal environment is temporarily unavailable, decide whether the relevant property can be established another way. A verified build record may support a claim about package contents while the service is offline. A design description may explain the intended permission decision but leave behaviour in the running service unknown. Record which claim the substitute can support and book the outstanding work. The cost of a delay belongs in the approval decision alongside the consequence of proceeding with incomplete evidence.

A recurring maintenance route can make the next decision faster. Agree in advance which assets, checks and version identifiers qualify for that route. Set an escalation condition for changes in exposure, unexpected scan limitations or new dependencies. Give the release owner access to recent examples of a complete record so the owner can recognise when a result falls short. Review the route when a change repeatedly needs exceptions. The pattern may reveal that the automated method covers less of the service than the release process assumes.

Record the limits before anyone signs

Store the scan date, build, asset inventory and exceptions with the release decision. Include the scanner’s findings or a stable reference to the retained result. Record what work the team did to handle disputed results. Someone reviewing the decision later should be able to tell whether a gap was fixed, accepted for a limited period or sent for further examination. Capture the approval date and the point at which the evidence has to be refreshed.

For manual work, preserve the agreed scope and the dated conclusion alongside the change record. Ask the reviewer to distinguish functions they assessed from functions that were unavailable. Tie any confirmation of a fix to the build where the change was verified. A ticket status can show that a developer completed a change. Give the assessor or release owner a separate place to record whether the evidence for the required condition is now sufficient.

Decide what happens when the evidence arrives late. If a planned review falls outside the release window, you may be able to hold the affected feature back and ship work whose assurance is complete. Ask engineering to show that the feature is unavailable in the relevant deployment and that the rest of the release does not depend on it. If that separation is uncertain, give the release approver the evidence gap and a date for reconsideration. Avoid writing a time-limited exception with no person responsible for closing it.

Apply the matrix to two changes

At a fictional Swiss engineering firm in Baden, the facilities team runs a utility that organises maintenance reminders. The release updates a date formatting library without changing its audience, data sources or access rules. The release owner asks whether the approved revision of the package appears in the deployed utility and whether scheduled checks find any new issue in the part that changed.

The security lead ties the package inventory to the build and checks the authenticated scan status for the two machines on which the utility runs. One machine dropped out of the first run because authentication expired. The owner renews the approved access and schedules a new run for that machine. The completed evidence shows the intended package in the deployed build and records the scan scope for both machines. The owner concludes that scan and build evidence answer the stated question, stores the coverage record and approves the maintenance release. The missing observation changed the timing of the decision without changing its method.

In a separate fictional case, a business software supplier in Neuchâtel adds delegates to a credit note workflow. The customer organisation can appoint a delegate for an individual branch. The product change also lets head office staff act for several branches. An expired appointment must stop granting approval rights, and the product owner expects the same rule on the web interface and the API. Finance will use the release decision to approve the first deployment.

The dependency scan and external vulnerability scan provide baseline evidence for the supplier. The changes to approval authority call for a separate conclusion. The security lead requests a manual review of the approved policy, the handling of appointment expiry and the behaviour of the two interfaces in a realistic environment with fictional accounts. The operations owner provides the source of branch assignments. The finance owner confirms what counts as approval when someone has several responsibilities.

During the review, the assessor finds that the environment includes branch delegates but lacks the scheduled change that expires their appointments. The report can answer part of the question and records the missing evidence. The product owner delays the delegated workflow, while the team prepares an environment that supports each stage of the appointment. After review of the completed workflow, the approver can decide whether to enable it. The completed baseline is still useful for the package and exposure questions it was commissioned to answer.

Both teams document their choice before approval. The facilities team explains how it established coverage after an initial gap. The software supplier explains why judgement about authorisation remained necessary after its tools completed. Their decision records give the next reviewer an account of what changed, what evidence applied and when the conclusion may become stale.

Put a method decision in the release ticket

Complete one record for each material question about the change. A release that combines routine maintenance and changed permissions may need more than one record. Link to a single inventory or report wherever it answers more than one question, and record the outcome against each question separately.

  • Write the claim the approver will rely on, the decision date and the name of the approver. Use a claim that could be proved wrong by evidence.
  • Describe the affected function, the consequence of a wrong decision and the access or data boundary involved. Include the existing control you expect to limit harm and its evidence.
  • Name the relevant change and version. List the dependencies, permission rules or integrations that moved with it. Record where the evidence comes from and why it applies to the release environment.
  • Choose scan-led, manual or combined work. For each method, name the question it answers and what it leaves for another check. Record who will accept the result.
  • Give the expected scope and the observed scope. Track missing scan authentication, unavailable assets, missing roles or unrepresented settings as gaps with owners and dates.
  • Record the outcome as approve, hold, or approve with an explicit and dated condition. Attach the evidence and name the person who confirms closure of any condition.

If you need to revisit your decision, open the record at the claim and follow its evidence. A new scan may be sufficient when a later maintenance build changes the version again. A change to where permissions come from can invalidate the conclusion about the workflow even if the earlier assessment is recent. Give the approver an explicit review trigger so a previously sound conclusion does not silently become policy for a different release.

Put it into practice

Key takeaways

  1. 01Write down the question before choosing the method.
  2. 02Check that the scan covers the release artefact.
  3. 03Require contextual evidence for material authorisation changes.

Sources

← Back to the blog

Frequently asked questions

Can we still run a scan during a manual review?

Yes. Use it to collect repeatable evidence and ask the reviewer to interpret the decisions that depend on application context.

What should a scan report identify?

Keep the artefact version, coverage and configuration with the result so someone can judge whether it answers the question.

Scope the release decision

Bring the release decision and available evidence when discussing audit scope.

Deep Audit SprintDiscuss your scope